|
Written by Administrator
|
|
Monday, 02 March 2009 13:06 |
|
About our cabinets: - We custom manufacture your cabinets right here in Austin, TX.
- Any size and shape of cabinet can be fabricated to "Fit the Hole"
- Our standard cabinets are made of paint grade double refined MDF. Optional plywood material is available at additional costs. We do not use laminates due to lack of durability, de-lamination issues and color restraints.
- The cabinets are ultra secure and strong because we nail, glue and screw the cabinets together.
- Each shelf has a 200 lb weight capacity. 1-1/2" front shelf stiffeners prevent sagging.
- We build real cabinets boxes. Each cabinet has a separate side, top and bottom.
- Gives cabinets a strong structural integrity
- Eliminates any space and gaps between walls and ceilings
- Finishes out interior of cabinet.
- All floor cabinets have toe kick bases made of solid wood material. No MDF touches the concrete to reduce any issues with swelling or water intrusion into your cabinets.
- We also offer an option of raising the cabinets off the ground using cabinet legs or free floating, though this will reduce the load capacity of the cabinets.
- Our door hinges are high quality nickel-plated 3-way adjustable hidden Salice brand hinges to prevent door sagging and door popping.
- We use Bereson quality metal door pulls in many different finishes – (no cheap plastic handles are used). We offer a wide variety of style choices to match you house or your Theme
- Cabinet Drawers are fabricated using furniture grade ½" Baltic birch plywood sides and 1/8" luan bottoms with high quality Knape and Vogt full extension drawer rails.
- Cabinet finishing is almost unlimited; we can paint or stain your cabinets to any spec color to match your house or style.
- Our exclusive custom epoxy topped worktop can be color matched to your epoxy floor or any color. It's chemical resistant and durable.
- We offer a limited lifetime warranty on our cabinets with free door hinge adjustments throughout the life of your cabinets.
- You will see that our cabinets are an excellent value.
Cabinet standards: Economy: - 3 /4" thick MDF boxes
- 5/8" thick MDF doors
- 2x4 base
- 3/ 4" thick shelves
- knape and vogt 255 zinc shelf rails and clips
- Nickel plated door pulls
- Knape and Vogt 8350 ¾ extension drawer rails (75lbs weight load)
Standard: same as economy with addition to: - Base boards
- Upper Crown molding
- Filler trim on Side trim mold
- 1 ½" shelf supports
- Caulk all seams, edges and joints
- Knape and Vogt 8800 full extension drawer rails (200 lb weight load)
- Exterior paint or stain
Premium custom cabinets: same as standard with addition to: - Cabinet backs
- Interior finish paint to boxes and all shelves
- Custom door pull selection
Cabinet workflow: - Cabinet layouts are approved and signed off by client
- Cabinet parts fabricated at shop and bundled for delivery
- Specialty items such as drawers and benches etc fabricated at shop
- Cabinet parts delivered and unloaded into clients garage
- Installers assemble and mount cabinets on site
- If interior paint is requested, all shelves and inside of boxes are painted before doors, shelf hardware and trim are installed
- Hang doors, trim and install shelf hardware
- Exterior paint on all doors and boxes
- Install door handles and load cabinets.
Lead-time: - Standard: 2 weeks lead required on all custom cabinet orders. Lead-time starts after all customer signs offs and 50% down payment has been received.
- Rush orders: Possible rush installation available on request. No discounts apply and 5% rush charge fee to be applied on all orders.
About our concrete floor coatings: - We use high-end industrial grade materials from the best manufacturers
- Because were not a franchise or a representative of any product line, we offer and install wide variety of products and services including:
- Floor grinding and polishing
- Concrete sealing and fortification
- Acid Staining /scoring
- Polyurea floor coatings
- Epoxy floor coatings
- Polyurethane floor coatings
We offer decorative chip/flake and quartz color additives to any polyurea, epoxy and polyurethane floor coating. Floor preparation: - Unlike most of our competition, we prepare your floors using both chemical and mechanical processes. This system maximizes floor to product adhesion.
- First we sweep and blow out floor and inspect for damage and issues
- We spot grind trouble areas and shape all rough curbs to an even profile
- We then apply a cleaner/degreaser solution to the floor and scrub using a 20” mechanical floor unit and rinse
- We apply chemical etching solution to profile remaining floor
- Application of neutralizing cleaner and scrub in using 20” mechanical scrubber and thoroughly rinse
- Where older floors have heavy residue or a poor profile exists, complete mechanical grinding may be used to guarantee proper adhesion of the product to the concrete.
- All cracks are filled and imperfections are addressed to ensure a quality flooring finish.
- Repair all existing underpinning if damaged.
Standard epoxy floor coating system: - Our epoxy base coating is a solid high performance epoxy coating that goes on between 5 and 10 mils thick depending on the condition of the concrete. It's a versatile two- package, chemically cured, tile-like epoxy coating with excellent chemical, corrosion, moisture, stain and abrasion resistant product.
- Our Decorative vinyl color chips/flakes are available in six sizes, including: Original (random 1/4" - 1"), 1/2", 1/4", 1/8", 1/16" and 1/32". Each size provides unique appearance and texture qualities to the surface. Colors can be custom blended to your preference.
- To finish your floor, we use a high performance; two-component chemically cured aliphatic urethane topcoat that results in a long lasting finish. It is very UV stable and gives a great glossy finish to the floor.
- If your worried about slip and fall issues, we offer a non-slip additive to the top coat at no extra charge.
- We offer a limited 15-year warranty against any de-lamination of our floor system.
|
|
Last Updated on Monday, 02 March 2009 13:10 |